Skip to main content

Redirect ItemDetail

The link that you are referencing is outdated!
If the item currently exists in our website, it is displayed below. If not, the link that you are referencing is no longer valid and no longer exists on our website. We will have some collections moved in the coming months. See what's coming in updates for Signature Collections or Digital WHILBR Collections on ContentDM.
Men and mules used to level and move dirt during the repairs at Big Pool

Men and mules used to level and move dirt during the repairs at Big Pool. In the background you can see the footbridge that spans over the canal prism. Underneath the foot bridge would have been a pivot bridge and stop gate. A stop gate was used when there was a break in a portion of the canal that threatened the loss of water throughout a level. The stop gate would be used to stop the loss of water on a canal level that was exceedingly long or in the case of Big Pool, large.