Big Pool - Repair men and mules 1

About

About
Big Pool
Floods and canal repairs

Media Items

Media Items
Media Items
ItemID
wcco122
IDEntry
5879
Rights
Public domain
Date
Unknown
Collection Location
C&O National Historic Park
Coverage
Maryland, 1824-1938
Body

Men and mules used to level and move dirt during the repairs at Big Pool. In the background you can see the footbridge that spans over the canal prism. Underneath the foot bridge would have been a pivot bridge and stop gate. A stop gate was used when there was a break in a portion of the canal that threatened the loss of water throughout a level. The stop gate would be used to stop the loss of water on a canal level that was exceedingly long or in the case of Big Pool, large.